Just a few minutes in the garage last night

Minor progress last night, but a couple things off my list. The throttle body is on, the exhaust is bolted up, both new engine mounts have some paint on them, and the solid bobble strut is re-installed with prothane bushings. That leaves my list like this:

  1. PS and ALT belts
  2. Wire up voltage regulator
  3. Build torque strut
  4. Connect water hoses to hardline
  5. Connect heater core water hoses
  6. Wire engine
  7. Install radiator
  8. Install cooling fans
  9. Install MS2/Extra firmware
  10. Re-install MegaSquirt
  11. Install PCV system
  12. Add hose barb to air cleaner pipe for valve cover breather

I’m sure that list will wind up growing before I’m all finished, but that’s what’s on my radar at this point.